Tap to Call (03) 261 9211
BACK

Consent Drawing

  1. Our design team will prepare the detailed consent drawing. This usually takes between 2 to 4 weeks.
  2. A building consent will be submitted and applied for. It usually takes between 4 to 6 weeks for a building consent to be issued.